California-licensed ADU specialist contractor based in Yorba Linda. CSLB #1099163, class B| C16. Identified in our directory because the business name explicitly contains an ADU keyword.
The data below is a snapshot of the CSLB Public Data Portal as of April 28, 2026. Status can change at any time (suspension, expiration, revocation, change in classifications, bond amount changes). Always click through to the CSLB Instant License Check above before signing any contract — that's the authoritative source, not us.
| License number | #1099163 |
|---|---|
| Business name | Impact Modular Builders |
| Primary status | CLEAR |
| Classification(s) | B| C16 |
| Business structure | Limited Liability |
| Issued | 2022-11-30 |
| Expires | 2026-11-30 |
| Mailing address | 22833 LA PALMA AVENUE, Yorba Linda 92887 |
| Phone | (949) 885 6916 |
| Contractor's bond | $25000 |
| Workers' comp coverage | Workers' Compensation Insurance |
Impact Modular Builders has held a CSLB class-B licence for 3 years (since 2022). Newer entrant — ADU specialist market has seen rapid licensing growth post-2017.
Business structure: Limited Liability.
Contractor's bond posted: $25,000 — the California statutory minimum for class-B contractors. Standard for the industry.
Workers' compensation coverage: Workers' Compensation Insurance. Required California coverage for contractors with W-2 employees. Verify the certificate of insurance directly with the carrier before contract signing — California has tightened WC-coverage enforcement post-2022.
A California class-B (General Building) contractor licence authorises the holder to take on building projects requiring at least two unrelated trades — framing + electrical, or concrete + plumbing + framing, etc. Almost all ADU work qualifies because an ADU is by definition a complete dwelling and requires multiple trades. A single-trade contractor (class C-10 electrical, C-36 plumbing, etc.) cannot prime an ADU project as general; they must subcontract under a B-licensed prime, or the homeowner must act as their own owner-builder.
This is a necessary condition, not a sufficient one. ADU construction has specific code requirements (Title 24 energy compliance, fire sprinklers in most jurisdictions, soils reports on sloped lots, accessibility provisions for JADUs) that not every B-licensed contractor has experience with. Ask for at least three completed ADU project references before committing.
Before signing a contract with Impact Modular Builders or any builder, verify each of the following independently:
BackyardADU is an independent reference site. Impact Modular Builders has not paid us to be listed. We do not endorse, rank, or vouch for the quality of any contractor's work. The profile above is derived from public CSLB Public Data Portal data (April 28, 2026 snapshot) and is provided as a starting point for your own diligence. The CSLB Instant License Check linked above is the authoritative source for current status.
If you're Impact Modular Builders and want to update or remove this profile, contact hello@backyardadu.net. We respond to verifiable owner requests within 24 hours.