BackyardADU

Building an ADU in Los Altos: 2026 cost & rules guide

Los Altos permitted 460 ADUs from 2013 to 2025 — among the most active markets in California. Here's what it costs, what's allowed, and who builds them.

Ordinance grade: B Region: Default Permit data through 2025 Permit data updated October 2026
Lifetime permits 2013–2025
460
Permits in 2025
89
+89× since 2014
Peak year
2023
109 permits
Typical cost range
$34,000–$342,000

How much an ADU costs in Los Altos

All-in design-build estimates (architecture + permits + construction + soft costs). Real quotes vary by lot conditions, finishes and contractor — get at least three before signing.

ADU cost by type in Los Altos
ADU typeAll-in cost, low to high
Detached ADU~750 sqft typical$128,250–$342,000typical $213,750$171–$456 per sqft
Attached ADU~700 sqft typical$99,400–$252,700typical $159,600$142–$361 per sqft
Garage Conversion~400 sqft typical$34,000–$91,200typical $56,800$85–$228 per sqft
Junior ADU (JADU)~400 sqft typical$34,000–$91,200typical $56,800$85–$228 per sqft
Prefab ADU~600 sqft typical$76,800–$205,200typical $127,800$128–$342 per sqft
Basement Conversion~600 sqft typical$59,400–$159,600typical $99,600$99–$266 per sqft
Each bar runs from the low to the high estimate, on a scale that starts at $0. The dark mark is the typical cost.

Per-square-foot ranges reflect 2026 pricing in the default market. Permit fees ($5–25k), site work ($10–40k) and high-end finishes can push totals 20–40% higher. See cost methodology for the full regression model and the 8 California builder-pricing sources it's calibrated against.

Los Altos ADU rules & zoning

California state law sets a floor that every city must meet. Los Altos may allow more than the minimums shown — confirm with the Los Altos planning department before finalising plans. See how we verify city-specific ordinance data.

RuleStandard
ADUs allowed on single-family lotYes — required by state law
Max units per lotSingle-family lot: 1 ADU converted from existing space, 1 JADU and 1 detached new ADU. From Jan 1, 2027 a second detached ADU, though a city need not then also approve a JADU. Lot with an existing multifamily building: up to 8 detached ADUs, not more than its existing units, plus conversions of non-livable space
Owner-occupancy requiredNot allowed to require for ADUs (state preempts)
Side setback (detached)4 feet
Rear setback (detached)4 feet
Max height16 ft; 18 ft within one-half mile walking distance of a major transit stop or high-quality transit corridor
Off-street parkingNone may be required within one-half mile walking distance of public transit, or in the other cases listed in Government Code section 66322; otherwise at most one space per ADU or per bedroom, whichever is less
Max ADU size850 sqft for studio/1BR; 1,000 sqft for 2+BR (city may allow more)
Min lot sizeA city may not impose a minimum lot size requirement for ADUs
Permit timeline (ministerial)60 days from complete application (state law)

Los Altos adopted its current ADU ordinance in 2019. Read the full ordinance text (PDF).

Pre-approved ADU plans in Los Altos

Los Altos runs a Pre-Approved Accessory Dwelling Unit Program. Source: Los Altos's page.

Checked 9 October 2026. Plan lists, costs and where the plans can be used change, so check the city's page before relying on them.

Changing on January 1, 2027

  • Two detached ADUs: cities must approve two detached, new-construction ADUs on a lot with a single-family home, up from one (AB 956).
  • Impact fees: on an ADU larger than 750 sqft, only the area above 750 sqft is chargeable, for the first two ADUs on a lot (SB 1117).
  • Plan check: no more than two plan-check rounds on a building permit application (AB 1621).

State law, effective statewide. What the 2027 ADU laws change, and what they don't →

ADU permit history in Los Altos

Annual ADU permits issued, 2013–2025. Sources: Big West Coast ADU Dataset for 2013–2017 and the California HCD Annual Progress Report (October 2026 release) for 2018–2025.

0
1
1
2
4
8
36
24
62
62
109
62
89
2013201420152016201720182019202020212022202320242025

How long ADUs take to build in Los Altos

Among Los Altos ADUs with a completion in the state's records, half were finished within 491 days (about 16.1 months) of the building permit being issued — 145 days slower than the statewide median of 346 days.

Median, permit to completion
491 days
Middle half of projects
290–666 days
Finished within 12 months
36%
Completed projects measured
179

Measured from California HCD Annual Progress Report records (October 2026 release): building-permit date to certificate of occupancy or final inspection, for ADUs permitted 2018–2023. The clock starts when the permit is issued, so design and plan check come on top. 62% of Los Altos ADUs permitted in those years have a completion on record; projects that were abandoned, are still under way, or were never reported as complete are not in the figure. Method, limits and every city →

ADU specialist builders in Los Altos

Active CA-licensed B-class general contractors with ADU-specialist branding, sourced from the CSLB Public Data Portal snapshot from April 28, 2026. Click any license number to verify current status at the CSLB Instant License Check — status can change at any time. See builder-directory methodology.

Uda Adu

512 Palm Avenue, Los Altos 94022
(310) 616 6697
CSLB #1146840 · B · first licensed 11/25/2025

Talk to a builder

Want an introduction to a builder or matching service that serves Los Altos?

Run the lot checker for your address. You get the rules that apply to your lot, a cost range and Los Altos's measured build-time figures first, and at the end you can ask to be introduced by email to one builder or builder-matching service that serves your area. Builders may pay us a referral fee for an introduction; it never changes anything on this page, and no builder can pay to appear in our directory.

Check my lot in Los Altos

Frequently asked questions

How much does an ADU cost in Los Altos?

Most Los Altos ADU projects fall in a $100,000–$400,000+ range, all-in (design + permits + construction). The big drivers are size, type (detached costs more than a garage conversion), and finish level. See the per-type cost table above for typical ranges in this market.

Do I need a permit to build an ADU in Los Altos?

Yes — every ADU in California requires a building permit. Los Altos processes ADU applications under the state's 60-day ministerial review rule (no public hearings, no discretionary review for code-compliant designs). Permit fees vary but typically run $5,000–$25,000 depending on size and impact fees.

Can my ADU in Los Altos be larger than 1,000 sqft?

It depends on the city. Under the general ADU ordinance rules, a city cannot set a maximum ADU size below 850 sqft, or 1,000 sqft for more than one bedroom, but the separate state-mandated detached ADU path may be limited to 800 sqft. Many California cities allow larger detached ADUs — check the Los Altos planning department or the ordinance link in our rules table above for the local maximum.

Do I need to live on the property to build an ADU in Los Altos?

No, not for an ADU. AB-976, in effect since January 1, 2024, made the state's ban on owner-occupancy requirements for ADUs permanent: California cities may not require an owner to live on the property as a condition of permitting an ADU. JADUs are different. A JADU that shares sanitation facilities with the existing structure requires the owner to live in either the house or the JADU; owner-occupancy is not required if the JADU has separate sanitation facilities, or if the owner is another governmental agency, land trust, or housing organization (Government Code section 66333).

What's the difference between an ADU and a JADU?

A JADU (Junior ADU) is a unit ≤500 sqft created within an existing single-family home, sharing a wall with the main residence. JADUs are cheaper and faster to build. A JADU that shares sanitation facilities with the existing structure requires the owner to live in either the house or the JADU; owner-occupancy is not required if the JADU has separate sanitation facilities, or if the owner is another governmental agency, land trust, or housing organization. Most homeowners build a separate ADU for rental flexibility.

How many ADUs are being built in Los Altos?

According to California HCD permit records, Los Altos permitted 109 ADUs in 2023, its peak year on record (2013–2025). California-wide ADU permits have grown roughly 30× since 2016 — homeowner demand is outpacing every other housing-supply tool the state has tried.

How did Los Altos's ADU ordinance compare to other cities in 2020?

UC Berkeley's Center for Community Innovation graded Los Altos's ordinance B in their 2020 ADU Scorecard, scoring the 2019 ordinance text. The mean grade across California was C+, so anything above that ranked as relatively homeowner-friendly at the time. This is historical, not current law: state-level updates since 2020 (SB-897, AB-2221, AB-976, SB-1211 and others) have raised the statewide floor and many cities have rewritten their local ordinances since the 2020 grading. Always check the current ordinance text linked above for what applies to a project you're about to start.

How long does it take to build an ADU in Los Altos?

Among Los Altos ADUs with a completion in the state's records, half were finished within 491 days (about 16.1 months) of the building permit being issued; the middle half took between 290 and 666 days, and 36% were finished within a year. That is measured over 179 completed ADU projects permitted 2018–2023, from building permit to certificate of occupancy. Design and plan check happen before the permit is issued, so allow for those on top. The statewide median is 346 days.

Check my lot: rules, cost, build time