Assembly Bill 1815 (Wicks, Chapter 782 of 2026) and Assembly Bill 2058 (Harabedian, Chapter 783 of 2026) were signed on September 29, 2026 and take effect on January 1, 2027. Neither mentions ADUs by name. Both change the California Factory-Built Housing Law, which covers many prefab and modular units. This page sets out what the chaptered text says, which units it reaches, and which parts do not start in 2027.

Updated November 2026 ~997 words

What changes on January 1, 2027

AB 1815 adds Health and Safety Code section 19993.1. A city, county or district "shall not impose or enforce local building standards applicable to a factory-built housing structure that exceeds or differs from the applicable mandatory standards contained in the California Building Standards Code." The next subdivision does the same for local energy-efficiency and green-building amendments that exceed the state's mandatory minimums.

AB 2058 adds section 19992.2. A local enforcement agency "shall not impose any permitting fee related to a factory-built housing structure that exceeds 50 percent of the equivalent permitting fee for a nonfactory-built housing structure."

The fee limit has one exit. An agency may charge more if, "as part of a written finding and an adopted resolution or ordinance", it "provides substantial evidence of the reasonable cost to review the permits."

Each bill says its new section applies to all cities, including charter cities.

Which prefab ADUs count

Factory-built housing, as AB 1815 redefines it, includes a residential building or dwelling unit that is "either wholly manufactured or is in substantial part manufactured at an offsite location to be wholly or partially assembled onsite", built so that concealed parts cannot be inspected at the site without disassembly, damage or destruction.

Both limits above apply to a narrower category, the "factory-built housing structure": a residential building "where at least two-thirds of the new or converted square footage is designated for residential use and in which at least 30 percent of the residential use portion of the building is built using factory-built housing". The 30 percent is worked out on the building's area, volume or size, as determined by the licensed design professional responsible for the project and subject to concurrence by the state housing department or a design approval agency.

Four things are excluded by name: "a manufactured home", "a mobilehome", "a recreational vehicle" and "a commercial modular". If a unit is sold as a manufactured home, these rules do not reach it. Ask the seller which category the unit is approved under, and whether it carries the state's insignia of approval for factory-built housing.

A factory-built ADU appears to fit the words "residential building". Because neither bill names ADUs, ask your building department in writing how it will apply them to your permit.

What a city can still control

Section 19993 continues to reserve "local use zone requirements", "building setback, side and rear yard requirements, site development and property line requirements, as well as the review and regulation of architectural and aesthetic requirements" to local jurisdictions. Those local requirements "shall not vary substantially from the requirements imposed on other residential buildings of similar size." For an ADU, the state ADU statute limits them further.

The new section applies "notwithstanding" section 19993, but only to local building standards. A rule about where a unit sits or how it looks stays with the city. If you are told a local requirement applies to a factory-built unit, ask whether the city treats it as a building standard.

A city or county can still change the state's building standards for these structures by the usual route: an express finding that the change is "reasonably necessary to maintain minimum health and safety because of local climatic, geological, or topographical conditions, including, but not limited to, wildfire risk and flood risk". The finding is a public record, and the change has no effect until the finding and the change are filed with the California Building Standards Commission.

Doubts lean towards the factory-built unit. The section creates "a rebuttable presumption in favor of a determination that facilitates the use of factory-built housing and allows a project to qualify as a factory-built housing structure", which can be overcome only by a written finding, supported by a preponderance of the evidence, that the determination would conflict with a state building standard or create a specific, adverse impact on public health or safety.

Inspections, and what waits for state regulations

Local enforcement agencies still enforce the installation of factory-built housing. New from 2027, a local enforcement agency or quality assurance agency "shall not disassemble, damage, or destroy factory-built housing while inspecting the installation".

Two other parts of AB 2058 do not start on January 1. The bill limits the fee for inspecting the installation of factory-built housing to 50 percent of the equivalent inspection fee for site-built housing, unless the agency sets out substantial evidence of its reasonable cost in a written finding and an adopted resolution or ordinance, and it lets the "first user" of the unit choose a private quality assurance agency to inspect the installation instead of the local agency. Both wait on regulations: the fee and quality assurance rules "shall not become operative until the department adopts regulations", and the Department of Housing and Community Development has until January 1, 2029 to adopt them.

Once they apply, a first user who chooses a quality assurance agency pays for those inspections, and the local agency cannot charge an inspection fee for them, though it "may charge fees for inspection of sitework for items not related to the installation of the factory-built housing, including, but not limited to, grading, foundations, and landscaping". A local agency keeps its authority to issue or withhold a certificate of occupancy.

What it means for the cost of a prefab ADU

The fee cap is written around a "permitting fee", a term the bill does not define. Ask your building department which of its charges it treats as covered, and how it will work out the site-built equivalent.

Neither bill changes what site preparation, foundations or utility trenching cost to build, and those remain a substantial part of what a prefab project costs. Impact fees follow their own rule: under SB 1117, also effective January 1, 2027, impact fees on an ADU larger than 750 square feet may be charged only on the area above 750 square feet, for up to two ADUs on a lot.

Neither bill changes ADU size, height or setback limits. A prefab unit can be one of the two detached ADUs that AB 956 requires cities to approve from 2027, if it meets the conditions in that statute.

Sources

This page summarises the statute. It is not legal advice, and a city's reading of a new law can differ in the first months. Ask your planning or building department for its position in writing before you spend money on plans.

Talk to a builder

Comparing prefab ADUs? Ask for an introduction to a builder

Tell us where and a little about the project and we will introduce you by email to one builder, or one builder-matching service, that serves your area. A matching service shares your details with the contractors it matches you with; a builder keeps them. If none in our network covers it yet, we will say so and point you to the licensed builders listed for your city; if that changes later, we will ask you again before sharing your details. Builders may pay us a referral fee for an introduction; that never changes anything published on this site, and no builder can pay to appear in our directory.

Ask for an introduction

Not sure about your lot yet? Check it first. One company, on your request. We never sell your details. How we are paid · Privacy

Frequently asked questions

When do AB 1815 and AB 2058 take effect?

January 1, 2027. The Governor signed both on September 29, 2026, as Chapters 782 and 783 of the Statutes of 2026. They are ordinary, non-urgency statutes. The cap on installation-inspection fees and the option of a private inspector wait for state regulations due by January 1, 2029.

Does AB 2058 cut permit fees for a prefab ADU in half?

It caps a local permitting fee related to a factory-built housing structure at 50 percent of the equivalent fee for a site-built structure, unless the agency adopts written findings with substantial evidence of its reasonable cost. The bill does not define permitting fee, so ask which charges your building department treats as covered.

Are installation-inspection fees capped from 2027?

No. AB 2058 sets a 50 percent limit on those fees, with an exception where the agency documents its reasonable cost, but the limit does not become operative until the Department of Housing and Community Development adopts regulations, which the bill requires by January 1, 2029.

Do these laws cover manufactured homes?

No. The definition of factory-built housing excludes a manufactured home, a mobilehome, a recreational vehicle and a commercial modular. Ask the seller which category a unit is approved under.

Can my city still set setbacks and design rules for a prefab ADU?

Yes. Zoning, setbacks, side and rear yards, site development and architectural review stay with local jurisdictions, and the state ADU statute limits how far those rules can go for an ADU. AB 1815 limits local building standards, not those rules.

Related guides